Patent Certificate Slab Formwork GF China Scaffolding Save Cost MB1812

Customization: Available
Certification: Patent Certificate
Material: Steel

Product Description

🔹 Basic Specification
Model NO.
MB1812
Type
Slab Formwork
Package
Pallet
Specification
1.8x1.2M-0.6X0.6M
Trademark
GF
Origin
China
Capacity
10000m2/Per Month
🔹 Product Overview
Slab Formwork Certificate
Green Formwork is an advanced Panel-Prop formwork system designed to facilitate the EARLY STRIPPING PROCESS. It offers a versatile solution for most concrete structures and components, meeting the rigorous requirements of diverse construction conditions.
Utilizing a systematic installation approach, the system adopts a 4-leg table structural mechanism, functioning much like a puzzle for ease of assembly.
🔹 Why Choose Green Formwork?

🚀 Simple & Innovative

  • Minimal components: Steel frames, bamboo plywood panels, and props with quick release.
  • No cross braces or tripods required.
  • Seamless horizontal and vertical transfer.
Formwork Installation Diagram
On-site Construction

⚡ Fast & Efficient

  • Optimized for a 3-4 worker team for erection and removal.
  • High productivity: Can achieve 60-80m2 of work per man per day.

🛡️ Safe & Reliable

  • Stable system featuring 6-direction locking restrictions.
  • Ergonomic design: No human lifting above the shoulder required.
🔹 Global Application
Our systems are utilized worldwide, including in the U.S.A., Canada, Czech Republic, U.A.E, Malaysia, Indonesia, Philippines, Thailand, Burma, and Cambodia. We provide safe, efficient, and cost-effective solutions for international construction projects.
Global Project Reference
🔹 Product Catalog
Scaffolding Tubes & Couplers
Screw Jacks
Ringlock Systems
Kwikstage Systems
Haki Systems
Adjustable Steel Props
Formwork Accessories
Aluminium/Steel Formwork
Full Product Range
❓ Frequently Asked Questions
💡 What is the "Early Stripping Process"?
The early stripping process is a feature of the Panel-Prop system that allows for the removal of panels and beams while the props remain in place to support the concrete. This significantly speeds up the construction cycle.
💡 For which types of projects is Green Formwork best suited?
It is ideal for flat slab or beam-less concrete structure projects, offering a systematic and puzzle-style approach to installation.
💡 How many workers are needed to operate this system?
A small team of just 3 to 4 workers is sufficient for efficient erection, stripping, and removal of the formwork system.
💡 Does the system require specialized lifting equipment?
No, one of the safety highlights is that no human lifting above the shoulder is required, making it safer and reducing the need for heavy machinery.
💡 What is the monthly production capacity for these units?
The production capacity for this model is approximately 10,000 square meters per month.
💡 Is the system stable for high-rise construction?
Yes, it is a highly stable system featuring 6-direction locking restrictions, ensuring safety and reliability across various construction conditions.

Related Products